Behind Schedule Sloth T-Shirt
Behind Schedule Sloth T-Shirt
Couldn't load pickup availability
- Premium T-Shirts
- Free Returns
- Fast Shipping
Buy More, Save More
Buy More, Save More
Any 2 items from the store = 10% off, 3 = 17% off, 6 = 25% off, 9 = 30% off on your total order. Want first access to new drops, flash sales, and seasonal discounts before anyone else? Join the mailing list. Love the brand enough to talk about it? Join the Brand Ambassador program and gain access to free or discounted t-shirts.
Description
Description
- 100% Ring-Spun Cotton: Made from ring-spun fibers, which are spun faster to create a tighter, smoother, and vastly softer yarn than standard open-end cotton.
- Made, Packaged and Shipped in the USA.
- Modern Classic Fit: Offers a sleek, semi-fitted silhouette that curves slightly closer to the body than boxy traditional tees.
- Thread Weight: Constructed with a tight, high-density knit (30-Singles, 4.5 oz/yd²). This gives it a lightweight, breathable feel making it an ideal choice for warm weather, layering, or active daily wear.
- Tubular Body Construction: Built without side seams, which means it feels seamless against the body and eliminates the risk of side seams twisting or warping in the wash.
- Sports grey and cardinal red: 90% cotton, 10% polyester. All other colours → 100% ring‑spun cotton.
Washing Instructions
Washing Instructions
How to Not Ruin Your New Favorite Shirt:
- Cold water only
- Turn inside out before washing (protect that graphic you're gonna wear until it falls apart)
- Use a gentle detergent - this garment-dyed cotton is chill, keep it that way
- First wash might bleed a little, so separate it from your fancy stuff
- Tumble dry low or hang dry (air drying)
Drying Instructions:
- Avoid High Heat: Air-drying is best to prevent shrinking and maintain the soft texture.
- Tumble Dry Low (Optional): If using a dryer, select a low heat or delicate setting.
- Remove Promptly: Take the shirt out of the dryer as soon as it's dry to prevent wrinkles.
Additional Tips:
- Avoid using bleach or harsh detergents as they can fade the color.
- Do not use fabric softeners, which may affect the shirt's texture.
- Avoid ironing directly on the design. Use a pressing cloth or turn the shirt inside out when ironing.
Shipping & Returns
Shipping & Returns
Good Things Take Time (But Not Too Long)
Orders ship within 7 days - we're not rushing, you're not rushing, nobody's rushing. Once it leaves our hands, you'll have it in 2-5 days. Track it obsessively or forget about it completely, we support both approaches.
Returns:
The "Something Went Wrong" Policy
Look, we want you to love your gear. If something arrives damaged, defective, or just plain wrong, we'll make it right - that's on us.
Here's the deal:
- Got something damaged or defective? Full refund, no questions asked.
- Have 30 days from purchase to let us know
- Item needs to be unused and in the condition you received it
- Contact us through the Contact form - we're actual humans who respond.
We're not a faceless corporation. If something's wrong, just reach out.
Policy subject to change, but we'll always keep it reasonable.
Share

S
